0

Levelised Cost of Energy Archives - Offshore Wind Installer
Sharing knowhow in offshore wind construction

Going Local: The Evolution of A2SEA Mobilisations

By Jens Nielsen, Director, Head of Procurement, A2SEA

We have now finalised two locally based mobilisations in the UK, representing a clear forward step in bringing projects and jobs to the region. So what has it been like to do this for the first time? And does it mean for the future?

Continue reading

Turbine installation and the levelised cost of energy: Bigger vessel payloads

By Hans Peter Johannsen, Vice President, Projects.

This is the third article in our series about reducing the LCoE in the offshore wind industry through optimising turbine loading, transport and installation.

A2SEA’s internal data supports wider industry observations that the cost of turbine installation per installed MW is, in fact, coming down. From our perspective (and remembering that turbine installation is a minor part of an wind farm’s overall development), there are gains to be made whenever we can load more megawatts at a time onto our vessels. This ability is strongly assisted by the increasing amount of power generated by larger turbines such as the MHI Vestas 8 MW. But that’s far from the full story.

Continue reading